Bojnourd Water Supply Project

Subject of the Contract:
Implementation of the transmission lines, pumping stations, and potable water treatment plant in Bojnourd


Employer: North Khorasan Regional Water Company
Consultant: Toossab Consulting Engineers Company
Contractor: Saabniroo
Duration of Contract: 30 months
Project location: North Khorasan Province - Bojnourd City



Project Description:
- The implementation of about 47 km of steel and GRP water pipeline (diameter 700, 900, and 1000 mm).
- Implementation of roadside facilities, including construction operations and the provision of electrical and mechanical equipment, controlling and instrumentation in four pumping stations, suction and pressure reducing tanks.
- Operating a water treatment plant with a capacity of 975 liters per second, including construction operations and the provision of electrical and mechanical equipment, controlling and instrumentation.



The main volume of work:
Earthworks: 1.828.700 cubic meters
Formwork: 81.700 square meters
Rebar steel works: 2,506 tons
concrete works: 36.600 cubic meters
Heavy steel works: 506 tons

Light steel works: 87 tons